GROSVENOR INQUIRY KEY ISSUE 5 SUBMISSION. INRUSH DEFINITION CHANGE And NEW SPECIFIC ‘METHANE INRUSH STANDARD OPERATING PROCEDURE” REGULATION

GROSVENOR INQUIRY KEY ISSUE 5 SUBMISSION. INRUSH DEFINITION CHANGE and NEW SPECIFIC ‘METHANE INRUSH STANDARD OPERATING PROCEDURE” REGULATION

Below is my Submission for a Change to the Definition of Inrush and for a New specific “Methane Inrush Standard Operating Procedure” Regulation.

KEY ISSUE 5 SUBMISSION INRUSH DEFINITION CHANGE

Att 1 Brown Direcrive floor heave gas Grosvenor Coal Mine – 04.05.2017

Att 2 Grosvenor LW104 Methane HPI Table Floor versus Goaf

Att 3 Inrush Regulations UG

The Submission is 6 pages all up and the start reads

FINDING 1

There has been an incorrect terminology applied by both the Grosvenor Mine and the Mines Inspectorate since the first Methane Inrush in Development in 2016.

They have used the term “Floor Heave” and then regularly state as ‘being accompanied by’ or  ‘associated with’ an uncontrolled methane “release”.

Methane is a “gas”.

RECOMMENDATION 1

The CMSHR 2001 Definition of “Inrush” in Schedule 9 be amended to

inrush means an unplanned or uncontrolled flood “or release” of liquid, gas or material that has the potential to create a hazard.”

RECOMMENDATION 2

Creating a new specific “Methane Inrush Standard Operating Procedure” Regulation