skip to Main Content
Twelve Methane HPI’s March 4th To 15th 2018

Twelve Methane HPI’s March 4th to 15th 2018

Before the planned Audit of the PMPM for Gas Monitoring is due to take place there are at least Twelve (12) Methane HPI’s reported to the DNRME Inspectors.

Eight (8) of these occur on 2 days the 13th and 14th of March.

Date Time of

Exceedance

Inspector Reported to

s243(a) Sensor (“149 Sensor”) Tailgate Sensor — 400m outbye

(“Inbye Sensor”)

Tailgate Sensor — 34 cit

(“Outbye Sensor”)

Time over 2.5% Factors mentioned
1)      04/03/2018 6:21am

Scully

Unknown 2.52% Unknown 2 Minutes and 22 seconds Shearer stopped At Chock #115 TG -MG

Outbye belts down

 

2)      08/03/2018 4:28am

Gouldstone

Unknown Unknown 2.53% at 3:13am

2.54% at 4:39am

4 Minutes

22 Minutes

Double Chocking.

2 events. Stopped double chocking in between.

Longwall stopped at 1:44am high gas in TG. Only 5 shears previous 12 hours

3)      12/03/2018 10:55pm

Gouldstone

Unknown 2.61% Does not change

WHY?

1 Minute Goaf Flushing around #149
4)      13/03/2018 8:09am

Gouldstone

Unknown 2.87% 2.79%

11 minutes later

Unknown 3 Cuts TG to bring TG forward due to poor roof.

Gas Flush when chocks advanced

Daily TG gas M’ment IMT

5)      13/03/2018 2:55pm

Gouldstone

Unknown 2.52% at 2:55pm

2.53% at 4:23pm

2.53% at 3:06pm

2.60% at 4:36pm

8 Minutes 2 Cuts TG to bring TG forward due to poor roof

Gas Flush when chocks advanced

6)      13/03/2018 23:54pm

Brown

Unknown 2.76% 70 seconds Cut into TG

Shearer parked at #115.

Crew started bringing over chocks

 

 

 

 

7)      14/03/2018 3:37am

Marlborough

Unknown 3.21% 2.65% 1 Minute Shearer Cutting TG corner of face
8)      14/03/2018 4:51am

Brown

Unknown 2.56% 2.73% 5 Minutes Poor Roof Conditions in TG Ventilation path restricted
9)      14/03/2018 7:20am

Brown

Unknown 2.7% 2.59% 5 Minutes 2 Cuts TG to bring TG forward due to poor roof

Gas Flush when chocks advanced

Shearer stopped at time

10)   14/03/2018 1:29pm

Marlborough

Unknown 2.53% 9 Minutes

 

Were workers in TG working in greater than 1.25%?

Shearer parked at MG Maintenance since 8:40am, Workers in TG supporting roof.

Attributed to goaf fall

11)   14/03/2018 2:47pm

Brown

Unknown <2.5% 2.59% 45 Minutes Shearer parked at MG Maintenance since 8:40am
12)   15/03/2018 11:18pm

Gouldstone

Unknown Unknown

<2.5%

2.62% 33 Minutes Longwall not producing

Goaf Flushing #149

AFC run gas goes <2.5%

 

 

 

This Post Has 0 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *