GROSVENOR Stonedust and Change Management September 28, 2020 Stuart Vaccaneo Grosvenor 0 Comments 2016 Stonedust 2016 Change Management Grosvenor Extracts and My Comments Mines Department 2016 Mine Record Entries Change ManagementGrosvenor AnalysisStonedust Tweet Share Share Email Related Posts 8th February 2017 Inspection Development and Longwall MRE - Grosvenor Coal Mine + comments - 08.02.2017 POINTS TO NOTE The Inspectors explained… Inspectors Dobson Directive 15th December 2016. I spoke with UMM Bull on 20/12/16 with regards this and required these matters to be investigated as to why these were not classified as per CMSH Regulation 366 and reported as HPl’s. During the Grosvenor Inquiry there was extensive reference to the so called "Dobson" December 2016… Methane Inrushes in Development till October 2017 Grosvenor Mine 26th OCTOBER 2017 Gouldstone METHANE INRUSHES MG 103 Development The Development has progressed beyond 29CT… This Post Has 0 Comments Leave a Reply Cancel replyYour email address will not be published. Required fields are marked *Name * Email * Website Save my name, email, and website in this browser for the next time I comment. Comment
8th February 2017 Inspection Development and Longwall MRE - Grosvenor Coal Mine + comments - 08.02.2017 POINTS TO NOTE The Inspectors explained…
Inspectors Dobson Directive 15th December 2016. I spoke with UMM Bull on 20/12/16 with regards this and required these matters to be investigated as to why these were not classified as per CMSH Regulation 366 and reported as HPl’s. During the Grosvenor Inquiry there was extensive reference to the so called "Dobson" December 2016…
Methane Inrushes in Development till October 2017 Grosvenor Mine 26th OCTOBER 2017 Gouldstone METHANE INRUSHES MG 103 Development The Development has progressed beyond 29CT…