6th September 2016 Investigation into Roof-fall MG 102 C Heading 18 to 19 CT
POINTS TO NOTE Statements in the reports from Terry Medhurst (Principal Geotechnical Engineer — PDR Engineers) and Lesley Munsamy (Lead Geotechnical Engineer — T&S AAC) indicate the following Megabolts…