1st April 2016 LW 101 Second Workings Meeting

POINTS TO NOTE

The intent of the meeting was to establish an open forum for discussion on Grosvenor Longwall 101 Second Workings. A presentation was given by representatives of the Senior Management Team

 

GAS MANAGEMENT PRESENTATION BASED ON PLAN EXISTS AS AT 1ST APRIL 2016

GCM STRATA STUDY SHOULD EXIST

DUST MANAGEMENT PLAN SHOULD EXIST THAT ADDRESSES THESE POINTS AS A MINIMUM

Use of TOLK product for strata consolidation, due diligence required on checking the material and consideration to health monitoring if used.

PUR USE PROCESS

Goaf wells planned to be used and management thereof.

WHAT WAS THE PRESENTED PLAN?

 

In regards to TARPs, the Mines Management Structure needs to reflect the positions within the TARPs in line with recent changes of structure at the Mine.

FIRST INDICATION OF FREQUENT ROLE CHANGES AND NEW MANAGEMENT PERSONELL

 

At the close out of the meeting, UMM Mr Wayne Bull presented Inspectors for perusal, the

Risk Assessment for Second workings, Version 1 GRO-6898-RA LWIOI Secondary

Workings, dated 12 January 2016 and, Draft SOP Version 2 Second workings LWIOI .

 

WAS IN THE INSPECTOR FEEDBACK?

WHEN WAS IT SENT?

WHAT WAS THE PROCESS FROM THEN ON?

01.04.2016 MRE and Comments – Grosvenor Coal Mine – 101 2nd work