skip to Main Content

The meeting was called at the request of Inspector Marlborough to discuss the recent 27 exceedances of 2.5% methane in the LW102 TG. Reconsidering if the bleeder could be made a return. Inspector Marlborough requested a copy of the Ventsim model which was the basis for the Mine decision to discount this option

  • July 19, 2021

A further 22 Methane HPI's occur between the 18th of January and the 19th of March 2018. On Monday 19 March 2018, Inspectors Marlborough, Brown and Gouldstone held a meeting…