1st April 2016 LW 101 Second Workings Meeting

  • September 8, 2020

POINTS TO NOTE The intent of the meeting was to establish an open forum for discussion on Grosvenor Longwall 101 Second Workings. A presentation was given by representatives of the…

8th March Electrical MRE Grosveor

  • September 7, 2020

08.03.2016 Electrical + comments POINTS TO NOTE Electrical Reporting Structure               “Not robust”. No shift sign off? Against the Act and Regulations? Also, another Contractor Management Failure. CRO Not as…

11th February 2016 Ventilation Audit MRE

  • September 7, 2020

POINTS TO NOTE THE SIG SYSTEM is the tool used in the audit by the DNRME. Its use and the associated MRE also dated the 11th February touch on areas…

11th February 2016 Grosvenor MRE Inspection CH4 HPI

  • September 7, 2020

POINTS TO NOTE CONTRACTOR MANAGEMENT and RESPIRABLE DUST WORKING IN RETURNS METHANE HPI Inspectors find that increased monitoring makes resuming mining in MG 101 that the level of risk is…

10th February 2016 GROSVENOR MRE ANALYSIS

  • September 6, 2020

POINTS TO NOTE DOES IT MEAN THAT THEY WOULD NOT BE CUTTING THE LOWER PART OF THE SEAM AND INTERBURDEN. SO NOT TO BE PUTTING COAL WITH EXTRA IMPURITIES THROUGH THE…

09th February 2016 Grosvenor Methane HPI MRE

  • September 2, 2020

This is the first High Potential Incident HPI and Mine Record Entry for excessive methane at Grosvenor, There is the first in a series of MRE over the days of…