skip to Main Content

North Goonyella MRE 12th July 2018. Proposed Sealing Management Plan. “The documentation is comprehensive and adequately provides for the risks during and after the sealing process to be managed to an acceptable level. Accordingly acknowledgement is made, pursuant to Regulation 327(1)(b) and the sealing may proceed” Les Marlborough

  • February 21, 2021

MRE - Sealing notice LM North Goonyella - 12.07.2018.pdf The documentation is comprehensive and adequately provides for the risks during and after the sealing process to be managed to an…

North Goonyella 9Nth MRE 30th May 2018. “The two gas monitors one in the take-off road and the second the Longwall 9N inbye monitor were examined. the first was hung by a hook over roof mesh and too high to read, footprints on pipes stacked below was evidence of persons climbing to view the displays. The second was covered in dust but equipped with a lowering rope to bring it into view.”

  • February 15, 2021

MRE - North Goonyella - 30.05.2018.pdf If you are going to read any of the Mine Record Entries I have posted this is the one. This Mine Record Entry is…

North Goonyella Mine Fire 24th October Post A. “Mr Black stated results are unreliable due to lack of confirmed TB line integrity at 32G also uncertainties of integrity of a number of other TB lines. Mr Black explained the difficulties the Mine was experiencing with the tube bundle lines. When we asked about some of the results the Mr Black again stated that we could not rely on some of these gas readings.”

  • February 12, 2021

MRE - North Goonyella - 24.10.2018.pdf There are problems with the pressure readings, tube bundle lines and gas analysis results that the mine is collecting. Repairs to tube bundle lines.…

North Goonyella Mine Fire 22nd October 2018. “Whilst travelling along MG9N road it was observed that all tube bundle lines were run along the eastern side of the road edge. I discussed with Mr Anger and Mr Romenski the potential for damage to these lines from vehicles due to no demarcation or protection from vehicles.

  • February 12, 2021

MRE - North Goonyella - 22.10.2018.pdf During an Inspection of the Surface Facilities Inspector Nugent made the following observation and comment. Whilst travelling along MG9N road it was observed that…

North Goonyella Mine Fire 10th October 2018. “One of the in seam drainage blow skids was found to be breathing in. This indicates that the water trap underground has blown out and the gas could be free venting into the Mine atmosphere. Dennis Black stated that they would attempt to fill the riser and attempt to refill the water trap in this manner”

  • February 11, 2021

MRE - North Goonyella - 10.10.2018.pdf H9 temperature at 59 degrees C, drone with thermal indicator to be used as a check. This has gone up from the first reading…